Saturday, May 16, 2009

Bulkheads, bulkheads and more bulkheads

Got busy this week and made all the bulkheads for both of the floats. Even though I haven't finished the first 1/2 yet it does give me a bit of a head start on the next half as the bulkheads will be done already.


Making the bulkheads was speed up considerably by making two seperate bags so that I could do four bulheads at the same time.








Also got the bow stringer and chain plate pad glued to the hull ready to glass on once I have cleaned up the fairing filler around the edges.



Then at the end of the week I glued in the first bulkhead just to make it look like there had been some progress!

Tuesday, May 12, 2009

Bulkheads

Started vacuum bagging the bulkheads for the floats today. First time I have tried vacuum bagging and I was suprised how easy it was. Admitidly I am only doing some small panels and I can imagine that I would get a bit pushed for time on a large panel.

I was worried about how difficult it would be to achieve a good vacuum pressure. Although I did have some small leaks when I first turned the pump on, only got 15" Hg vacuum initally,it was easy enough to find the leaks and eventually got a vacuum of 28" Hg.



Vacuum setup. I put the extra layer of sealing tape around the edge mainly because I didn't know what I was doing and turned out to be completly unnesaccary.

Monday, May 11, 2009

minor repairs

After removing the peel ply there were three spots that required
some carefull attention with a grinder. These spots were not wetted out and had lifted from the core. I ground these spots down and applied a suitable sized patch results are as per the picture below.


Saturday, May 9, 2009

Laminating 1st Float 1/2

After spending a couple of nights during the week cutting the fibreglass to shape and putting a bit of fairing filler along the keel join to smooth it out I am ready to glass the first float 1/2. Then I had to make a few phone calls to get some mates around to give me a hand to lay down the cloth, the promise of beer and food can be a great motivator!

You can see the fibreglass in the back ground just waiting for some eager volunteers!

As you can see plenty of helpers turned up which I am very thankful for. It meant that I was on resin mixing duty for the greater part of the whole exercise,hardly even got my hands dirty!


A bit of final quality Control before the peel ply goes on.






I tried "poor mans vacuum bagging" which I had seen being used by others and as I hadn't seen it before thought I would give it a go. Checked on the results the next day and I am not convinced as to the effectivness of using the plastic over top of the peel ply and the jury is out at this stage. I can see that it may be useful on flat areas but when there are some curves involved it may not be as effective?

Saturday, May 2, 2009

1st float 1/2 planked

Had a bit of a delay over the last few weeks while I was waiting for the foam and fibreglass to arrive from the suppliers. Amazing how retailers are very quick at taking your money but not always on the ball when it comes to delivering the goods. However now that I have got the foam it only took a couple of days get it onto the frames and glued together.

ready for laminating the fibreglass



I decide to glue the foam with epoxy glue rather than a polyurathene construction type of adhesive. I did a trial with some polyurathene glue but I had some concerns with the stength of the glue. After I had left it to set for a few days I could still pull apart the foam pieces I had glued together along the glue line. I also had some concerns if the glue was water proof or not. It said on the label that it was weather proof but I wasn't sure if that meant water proof.

Saturday, April 11, 2009

Strong back


With all the materials to build the hulls ordered and on the way I got under way with building the strong back and setting up the form frams to start building the floats.

After spending some time studying the plans I decided that the easiest place to start was actually at the begininnng strangley enough. So with that in mind I decided to start on page 1 and get on with building the floats.

I spent quite a bit of time over the week getting the strong back nice and level and roped in a builder mate of mine and used his theodalite level to get it as close as possible.

Friday, April 3, 2009

Decisions decisions

After Stuying the plans for a month and getting quotes for the materials from various suppliers I ordered the materials today.

There have been alot of decisions made this month. Firstly which technique to use to build. Good old fashioned hand layup, vacuum bagging or resin infusion. There is alot of info on the net regarding Vacuum bagging and resin infusion.

When I started thinking about building a yacht a couple of years ago I was very interested in resin infusion. Although the end product will be very high quality with infusion I decided to go with hand layup. I will be considerably quicker to build and it may be a few kilo's heavier but as Ian Farrier recomends handlayup to build one of these yachts it can't be that bad. Hand layup is afterall the technique that has been used successfully for a long time and should be quicker and invlove less risks than infusion.

I have decided to build the 'R' version, I can't help it really I would rather sail fast than slow, and based on the theory that you can make a fast boat go slow but you can't make a slow boat go fast so I opted to go with taller R rig. Initally I thought I would build using the minimum fabric weights as specified in the plans but after a bit of reflection I thought itmight end up a bit of an egg shell and lets face it when a yacht gets a bit of use it will eventually bumpinto the jetty or something else and the slightly heavier fabrics will give a little more protection.